I-40 Walnut Canyon Westbound |
| |
Project No.: |
40 CN 205 H545701C ARRA-040-E(202)A |
| |
Location: |
Project is westbound only from MP 209.1 to MP 205.1. The Cosnino Interchange is located within this project. |
| |
Contractor: |
C.S.&W. Contractors, Inc. |
| |
Programmed Cost: |
$5,809,917.48 |
| |
Scope: |
Reprofile the vertical curves. This involves taking out some of the small grades. |
| |
Expected Project
Duration: |
Project will run into the fall of 2009 at which time it will stop. It will be resumed and completed Spring 2010. |
| |
News Release: |
ADOT to close westbound I-40 ramps at Cosnino Road ~ June 24, 2009 |
| |
|
|
| McGuireville Rest Area – Yavapai County Line S/B |
| |
Project No.: |
017-YV 296 H613601C IM-017-B(008)A |
| |
Location: |
McGuireville Rest Area, and the south bound lanes from the Yavapai County Line to the rest area. |
| |
Contractor: |
Fisher Sand & Gravel Co. dba Southwest Asphalt Paving |
| |
Programmed Cost: |
$6,333,333 |
| |
Scope: |
Make waste water system improvements at the McGuireville rest area; mill and replace the existing asphalt and apply friction course from the county line to the rest area. |
| |
Expected Project
Duration: |
Fall 2009 to Summer 2010 |
| |
|
|
| SR 89A Continuous Highway Lighting |
| |
Project No.: |
89A YV 371 H7130 01D, HES A89-B(202) |
| |
Location: |
SR 89A from milepost 371 to 373 |
| |
Contractor: |
Not bid yet |
| |
Programmed Cost: |
Current estimate $2,000,000 |
| |
Scope: |
Install continuous highway lighting and traffic signal at Andante. |
| |
Expected Project Duration: |
Projected for Fall 2010 to Spring 2011 |
| |
Project Documents: |
Sedona Pedestrian Crossing Study |
| |
|
Highway Enhancements for Safety Report |
| |
|
Funding Approval |
| |
|
Revised Funding Approval |
| |
|
Final Project Assessment |
| |
|
Final Lighting Design Criteria Report |
| |
|
Presentation to Sedona City Council October 28, 2009 |
| |
|
Public Information Packet on Lighting System Alternatives |
| |
|
Public Comment Form |
| |
|
Information on Nighttime Lighting |
| |
|
Final Pedestrian Crosswalk Study |
| |
|
Final Pedestrian Crosswalk Study Appendix |
| |
|
|
| SR 179 Village of Oak Creek to Y (Project 1 and 2) |
| |
Project No.: |
STP-TEA-A(001)B and STP-TEA-A(002)B |
| |
Location: |
Project 1 is from MP 304.5 (1 mile south of Village of Oak Creek) to MP 310.4 (Back o’ Beyond) and
Project 2 is from MP 310.4 to 313.4 (the “Y”) in the City of Sedona. |
| |
Contractor: |
Southwest Asphalt Paving (Project 1) |
| |
Programmed Cost: |
Project 1 $36,114,000
Project 2 $51,750,000 |
| |
Scope: |
Projects consist of complete rebuild of highway to a multimodal, two lane parkway. |
| |
Expected Project Duration: |
Project 1 Completed
Project 2 Spring 2008 to Spring 2010 |
| |
|
|